4/10/15 Administration Planning and Construction General State Authority Contract Files, 1935-1965 Box 1: Activities and Accomplishments of the General State Authority, 1935-1938 Electrical Construction of the Gymnasium, Junior High, Boy's Dormitory, Shop & Storage Buildings, and Boiler Plant Addition, 1937 General Construction of the Gymnasium, Junior High, Boy's Dormitory, Shop & Storage Buildings, and Boiler Plant Addition, 1937 Plumbing and Draining Construction of the Gymnasium, Junior High, Boy's Dormitory, Shop & Storage Buildings, and Boiler Plant Addition, 1937 Electrical Construction of Fire Alarm and Emergency Lighting Systems, 1938 Electrical Construction of Fire Alarm and Emergency Lighting Systems, 1939 Repairs to Passenger Elevator #1- Waller Hall, 1940 Recreation Field chain link fence, concrete curb and sidewalk, and demolition of chimney, 1941 Alterations and Additions to Noetling, 1941 Resurfacing and Refinishing Gymnasium, 1942 Waller Hall Alterations, 1943 Exterior Painting of Carver Hall, Waller Hall, Science Hall and North Hall, 1943 Alterations to Waller Hall - Plumbing and Heating, 1943 Alterations to Kitchen and Dining Room and Installation of Cafeteria Equipment, 1943 Replastering and Miscellaneous Repairs - North Hall, 1943 Renewal of Main Power and Lighting Feeders for Waller Hall, 1944 General Construction: Mechanical and Electrical Work for Alterations to Toilet Rooms, 1944 Repairs to Furnace Lining and Renewal of Water Column Piping, 1946 Renovation of Toilet and Wash Rooms in North Hall - plumbing and heating, 1947 General Construction for Renovations to Old Gym, North Hall and Library Room, 1947 Alterations and Repairs to Noetling, 1948 (517.1) Changes in Refrigeration System, 1948 (713) New Roofs for Science Hall and porches for North Hall and President's Residence, 1950 (1066) Electrical and Signal Distribution and Campus Lighting, 1952 (1384-4) General Renovations and Repairs for Carver and Waller Hall, 1953 (1496-1) General Renovations and Repairs for Carver and Waller Hall - electrical work, 1953 (1496-4) Renovation of Various Buildings - General Construction, 1954 (1672-1) Renovation of Various Buildings - Heating and Ventilation, 1954 (1672-2) Renovation of Various Buildings - Electrical Work, 1954 (1672-4) Box 2: Commons Electrical Work, 1955 (401-2.4) Library Equipment - Renovation of Dining Room and Library, 1957 (2156-6) Electrical work - New classroom building and extension of utilities, 1958 (401-3 & 401- 5) Electrical Construction - Men's Dorm, 1958 (401-4.4) Facilities for Special Education - Heating and Ventilation, 1959 (498-7.2) Miscellaneous Repairs for Exterior Pointing, Caulking, and Painting at Science Building, 1960 (3695-7) General Facilities for Special Education - Navy Hall, 1960 (498-7.1) Plumbing Facilities for Special Education - Navy Hall, 1960 (498-7.3) Electrical Facilities for Special Education - Navy Hall, 1960 (498-7.4) General Construction of Two Dormitories, 1962 (401-7.1) General Construction of Two Dormitories - Heating and Ventilation, 1962 (401-7.2) General Construction Phase II - Addition to Boiler House, 1962 (401-6.4) Miscellaneous Construction of Sound Proof Room, 1963 (PI-4413-5) Installing the Air Conditioning System - Library Area and Waller Hall, 1963 (PI-4639 -2) General Library Construction, 1964 (401-10.1) General Library Construction - Heating, Ventilation and Air Conditioning, 1964 (401 -10.2) General Library Construction - Plumbing and Draining, 1964 (401-10.3) General Library Construction - Electrical Work, 1964 (401-10.4) Air Conditioning - Carver Hall, 1965 (PI-5627-2.4) Plumbing Construction for Extension of Utilities, 1965 (401-11.3) General Construction of the Auditorium, 1965 (401-8.1) Heating and Ventilating Construction of the Auditorium, 1965 (401-8.2) Plumbing and Draining Construction of the Auditorium, 1965 (401-8.3) Electrical Construction of the Auditorium, 1965 (401-8.4)